Goldwind wind turbine foundation design works
By 2023, GENOSER could complete the foundation design of 83 wind turbines with the brand GOLDWIND, which equals 309 Mw.
The wind turbine foundation design is the main activity of GENOSER during these projects.
The DREN RES EXTENSION project was completed in Macedonia with the model GW155-4800-HH110-IECS where 9 turbines with a total installed power equal to 43,2 MW and the LIBERTY MILLS LIMITED project was completed in Pakistan with where 2 turbines with a total installed power equal to 9 MW.
In the local market, GENOSER could achieve a number of projects with the brand GOLDWIND where some of the biggest projects are:
Here are some details about wind power plants and their turbines:
– LIBERTY MILL Limited WPP in Pakistan has 2 turbines of the GW155-4500-HH95-IECS model.
– DREN WPP in North Macedonia has 9 turbines of the GW155-4800-HH110-IECS model.
– ŞULE WPP in Konya, Türkiye, has 11 turbines of the GW165-6X-100mHH-IECS model.
– BEYYURDU WPP in Yozgat, Türkiye, has 9 turbines of the GW165-6.0-100mHH-IECS model, with a total installed power of 30 MW.
– UŞAK WPP in Uşak, Türkiye, has 17 turbines of the GW165-6.0-100mHH-IECS model, with a total installed power of 102 MW.